Project Planning Definition and Glossary Comprehensive Terms and Concepts

Articles in this guide

Articles in this guide

solution-demo

Solution Demonstration: Strategic Portfolio Management

Learn how you can get a clear view into strategic initiatives and empower your organization to deliver outcomes faster with strategic portfolio management.

Watch the solution demo • Solution Demonstration: Strategic Portfolio Management
ebook

Dynamic Planning: 5 Steps to Rapidly Replan, Reprioritize, and Effectively Execute

Explore how dynamic project planning can help your organization pivot quickly and adapt in the face of change.

Se e-boken • Dynamic Planning: 5 Steps to Rapidly Replan, Reprioritize, and Effectively Execute

Introduction

This resource serves as an essential reference guide for project professionals at all levels, from team members to enterprise portfolio managers. The terminology compiled here bridges traditional project management fundamentals with modern adaptive approaches, reflecting the evolution of project planning in today’s dynamic business environment.

Whether you’re looking to understand a specific concept, expand your project management vocabulary, or gain clarity on the differences between traditional and contemporary planning methodologies, this glossary provides clear, contextual definitions organized alphabetically for easy reference.

Use this guide as a companion to the related articles below to deepen your understanding of how effective project planning drives enterprise value and supports strategic adaptation in uncertain markets.

Related Articles

Project Planning Glossary

A

Adaptive Execution: An approach that incorporates flexibility into project execution, treating change as an expected part of the environment rather than an exception.

Adaptive Planning: A planning approach that anticipates and accommodates changes during project execution, focusing on outcomes rather than rigid adherence to initial plans.

Adaptive Portfolio Planning: An approach to portfolio management that emphasizes flexibility, continuous adjustment, and responsiveness to change rather than rigid adherence to predetermined plans. Adaptive portfolio planning recognizes that business conditions, market opportunities, and organizational priorities shift over time, requiring the portfolio to evolve accordingly. This methodology incorporates regular review cycles, decision triggers, and feedback loops that allow for dynamic reallocation of resources based on emerging data and changing strategic priorities. Key components include flexible funding models (like incremental or rolling-wave funding), portfolio-level WIP limits, scenario-based planning, and outcome-based metrics that focus on value delivery. Unlike traditional portfolio planning that often locks in decisions annually, adaptive portfolio planning enables organizations to continuously optimize their investment mix, respond to market changes, and capitalize on emerging opportunities while maintaining strategic alignment.

Digital Project Image

EBOOK

5 Steps to Achieving Adaptive Portfolio Planning and Funding

Navigate the shift from reactive, traditional planning to proactive, modern portfolio management.

Download eBook

Adaptive Roadmap: A directional timeline with built-in decision points that allows for course correction as new information emerges.

Adaptive Workflow: Planning approaches that can be tailored to different types of work and levels of uncertainty within a project.

Agile Planning: An iterative planning approach that breaks work into small increments, allowing for rapid adjustment based on feedback and changing requirements.

AI-powered Analytics: The use of artificial intelligence to analyze project data, identify patterns, and provide predictive insights for planning and decision-making.

B

Backlog: A prioritized list of features, defects, enhancements, or tasks that have been identified but not yet scheduled or assigned.

Baseline: A fixed reference point representing the approved version of a project plan, used to measure and compare progress.

Bottom-up Planning: A planning approach that begins with detailed tasks that build up to the complete project, offering realistic estimates but sometimes lacking strategic context.

Budget: The approved cost estimate for the project, providing a financial framework for resource allocation and expense tracking.

Burndown Chart: A graphical representation of work left to do versus time, used primarily in agile project management.

Business Case: A documented economic feasibility study used to establish the validity of project benefits and determine if a project is worth the investment.

C

Capability Planning Model: A component of modern project planning that focuses on skills and capacity requirements rather than just specific resource assignments.

Capability-based Resource Planning: A resource allocation approach that focuses on the skills and capacity needed rather than specific individuals.

Capacity Buffer: Reserved capacity intentionally maintained to enable rapid response to emerging high-value opportunities.

Change Control: A formal process used to ensure that changes to a project’s scope, deliverables, timelines, or resources are introduced and approved in a controlled way.

Collaborative Planning: A planning approach that involves multiple stakeholders working together to develop project plans, increasing buy-in and incorporating diverse perspectives.

Contingency Planning: Developing alternative plans and strategies to be implemented if certain risk events occur during project execution.

Pivot At Speed Demo Image

EBOOK

Pivot at Speed: The Leader’s Guide to Planning Course Corrections

Explore why the ability to quickly identify opportunities and execute pivots is a hallmark of high-performing organizations.

Download eBook

Critical Path: The sequence of activities that determine the shortest possible duration of a project, where any delay will extend the project timeline.

Cross-portfolio Optimization: The practice of managing resources, investments, and priorities across multiple portfolios to maximize overall organizational value.

D

Decision Triggers: Predefined conditions or events that prompt reassessment of a project plan when key assumptions change.

Decision Velocity: The speed at which an organization can make informed choices about project direction and resource allocation.

Deliverable: Any unique and verifiable product, result, or capability produced to complete a process, phase, or project.

Dependency: A relationship where the start or completion of one activity relies on the start or completion of another activity.

Digital Thread: The communication framework that allows a connected data flow and integrated view of an asset’s data throughout its lifecycle.

Dynamic Planning: A continuous, iterative approach to project and portfolio planning that regularly adapts to changing conditions, new information, and emerging priorities rather than following a fixed plan established at the project’s outset. Dynamic planning acknowledges the inherent uncertainty in complex environments and embraces change as a natural part of the planning process. It involves shorter planning horizons, frequent reassessment of plans, built-in decision points, and mechanisms for rapid replanning when assumptions change. Key practices include rolling wave planning, just-in-time elaboration, scenario modeling, and continuous prioritization of work based on current value assessments. Unlike traditional planning approaches that aim to minimize change, dynamic planning builds the capability to respond quickly to change into the planning process itself, making it particularly valuable in fast-moving or uncertain business environments where the ability to pivot quickly provides competitive advantage.

Dynamic Planning Image

EBOOK

Dynamic Planning: 5 Steps to Rapidly Replan, Reprioritize, and Execute

Static plans lead to a static business. Explore how your organization can pivot quickly and adapt in times of economic uncertainty.

Download eBook

Dynamic Resource Management: The continuous reallocation of resources across projects based on changing priorities and emerging needs.

E

EPMO (Enterprise Project Management Office): An organizational structure that operates at the strategic level to align all project, program, and portfolio activities with enterprise-wide objectives. The EPMO provides governance, standardized methodologies, resource optimization, and strategic oversight across all organizational departments and business units, ensuring that project investments directly support the organization’s strategic goals.

Estimation: The process of developing approximations of project parameters such as effort, duration, and cost.

G

Gantt Chart: A traditional project planning tool that visually represents a project schedule with tasks plotted against time.

Governance: The framework, functions, and processes that guide project management activities to ensure a project meets organizational objectives.

H

Horizon Scanning: A systematic examination of information to identify potential threats, risks, emerging issues, and opportunities.

Hybrid Methodology: A project management approach that combines elements of both traditional (waterfall) and agile methodologies.

I

Investment Case: An ongoing value justification that replaces the traditional static budget baseline in modern project planning.

Investment Optimization: The process of allocating financial resources across a portfolio of projects to maximize return on investment and strategic alignment.

Issue: A point of discussion, concern, or dispute that has arisen during the project and requires resolution.

K

Kanban Board: A visual management tool that helps visualize work, limit work-in-progress, and maximize flow and efficiency.

L

Leading Indicators: Early signals or metrics that predict future project performance or value realization.

Lean Project Management: An approach focused on delivering maximum value while minimizing waste in project processes.

M

Milestone: A significant point or event in a project that marks the completion of a major deliverable or phase.

Minimum Viable Deliverable: The smallest version of a deliverable that still meets essential requirements and provides value.

Monte Carlo Simulation: A mathematical technique that uses random sampling to obtain a range of possible outcomes for decisions with uncertain variables.

O

Objectives and Key Results (OKRs): A goal-setting framework that connects measurable outcomes to strategic objectives.

Outcome-based Planning: A planning approach that focuses on desired business results rather than just project deliverables.

P

Portfolio Balancing: The process of adjusting project and initiative mix within a portfolio to achieve optimal distribution across strategic goals, risk levels, and resource needs.

Portfolio Governance: The framework of rules, practices, and processes used to make decisions about initiatives within a portfolio.

Portfolio Management: The centralized management of one or more portfolios to achieve organizational strategy and objectives. It involves identifying, prioritizing, authorizing, managing, and controlling projects, programs, and other related work. Portfolio management focuses on making collective investment decisions, allocating resources according to organizational priorities, ensuring the portfolio is balanced between short and long-term initiatives, and maximizing the value of the portfolio while managing risks. Effective portfolio management ensures that an organization can leverage its project selection and execution successfully to implement its strategies.

Portfolio Prioritization: The process of ranking projects and initiatives based on their alignment with strategic objectives and expected value contribution.

Portfolio Visualization: Real-time visibility into how projects connect to strategic objectives and to each other.

Probabilistic Forecasting: Planning that incorporates uncertainty by using ranges and probability distributions rather than single-point estimates.

Progressive Elaboration: The iterative process of increasing the level of detail in a project plan as more information becomes available.

Program Management: The application of knowledge, skills, tools, and techniques to a program to meet program requirements and obtain benefits not available by managing projects individually.

Project: A temporary endeavor undertaken to create a unique product, service, or result.

Project Charter: A document that formally authorizes a project, providing the project manager with the authority to apply organizational resources to project activities.

Project Lifecycle: The series of phases that a project passes through from initiation to closure.

Project Management: The application of knowledge, skills, tools, and techniques to project activities to meet project requirements.

PMO (Project Management Office): An organizational structure that standardizes project-related governance processes and facilitates the sharing of resources, methodologies, tools, and techniques across projects. A PMO may provide support functions to project managers, train project staff, establish project management standards, and monitor compliance with those standards. Unlike an EPMO which operates at the enterprise level, a traditional PMO typically has a narrower scope focused on specific departments, divisions, or project types.

Project Planning: The process of establishing the scope, defining objectives, and determining the course of action required to attain those objectives. It includes developing the project management plan and project documents used to carry out the project. Project planning involves creating the work breakdown structure, establishing timelines, estimating resource requirements, determining budgets, anticipating risks, defining communication needs, and setting quality standards. Effective project planning provides a roadmap that helps guide the team through execution while establishing metrics to evaluate performance and control mechanisms to address deviations from the plan.

Project Planning Tools and Software: Digital applications and platforms designed to facilitate the creation, management, and communication of project plans. These tools range from specialized software for scheduling (like Microsoft Project) to enterprise Project Portfolio Management solutions. Project planning tools typically offer capabilities for task management, resource allocation, timeline visualization (Gantt charts), dependency mapping, critical path analysis, and collaborative planning. Advanced solutions may include features for risk management, budget tracking, capacity planning, what-if scenario modeling, and integration with other enterprise systems. The right project planning tool depends on project complexity, team size, methodology used (waterfall, agile, or hybrid), and organizational requirements for reporting and governance.

Project Portfolio: A collection of projects or programs grouped together to facilitate effective management and achieve strategic business objectives.

Project Portfolio Management (PPM): The centralized management of an organization’s projects, programs, and related work as a collection of investments that contribute to strategic goals. PPM involves selecting, prioritizing, balancing, and governing a mix of initiatives to maximize portfolio value while managing risks and resource constraints. It provides decision-making frameworks for evaluating project proposals against strategic criteria, allocating resources based on organizational priorities, and monitoring portfolio performance as a whole rather than just individual projects. Effective PPM enables organizations to answer critical questions like “Are we investing in the right things?”, “Are we optimizing our capacity?”, and “How well is our portfolio delivering intended benefits?” Key components include investment governance processes, portfolio visualization, dependency management, capacity planning, portfolio risk management, and benefits realization tracking. PPM connects strategic planning to project execution, ensuring that project plans align with and support the organization’s strategic objectives.

Project Portfolio Management (PPM) Software: Comprehensive software platforms that enable organizations to manage multiple projects as a cohesive portfolio, aligning project activities with strategic business objectives. PPM software typically provides functionalities for project selection, prioritization, resource management across projects, portfolio analytics and reporting, risk management, and financial tracking. These platforms facilitate decision-making by offering portfolio-wide visibility, allowing executives and portfolio managers to evaluate project health, resource utilization, and strategic alignment simultaneously. More advanced PPM solutions incorporate features like scenario modeling, demand management, capacity planning, benefits realization tracking, and integration with financial systems. Unlike basic project management tools that focus on individual project execution, PPM software emphasizes optimizing the collective value of all projects while efficiently allocating limited organizational resources.

PPM Graph Image

ON DEMAND-DEMO

Planview Project Portfolio Management Software

See how Planview connects top-down/bottom-up planning and hybrid execution in one system to adapt priorities when change happens, manage new demand, and ensure resources and teams deliver what matters most to the business.

Se demo

Project Schedule: The planned dates for performing activities and meeting milestones within a project.

Q

Quality Assurance: The planned and systematic activities implemented within the quality system to provide confidence that a project will fulfill quality requirements.

Quality Control: The process of monitoring and recording results of executing quality activities to assess performance and recommend necessary changes.

R

Release Planning: The process of determining what functionality should be included in different software releases.

Resource Allocation: The process of assigning and scheduling resources to work that needs to be done.

Resource Capacity Planning: The process of forecasting, analyzing, and optimizing the allocation of people, equipment, and other resources across projects and operations to ensure sufficient capacity for executing planned work. Resource capacity planning compares resource demand (the work that needs to be done) with resource supply (available capacity), identifying potential bottlenecks, overallocations, or underutilization before they impact project delivery. This practice typically involves creating a central repository of resource skills and availability, forecasting resource requirements across the portfolio, analyzing capacity constraints, and balancing demand against available capacity. Effective resource capacity planning enables organizations to make informed decisions about project timing, hiring needs, contractor engagement, and project prioritization. Advanced approaches integrate resource capacity planning with portfolio prioritization to ensure that resources are allocated to the highest-value initiatives while maintaining sustainable utilization levels and accounting for non-project work.

5 Challenges Poster Image

EBOOK

Top 5 Challenges of Modernizing Resource Capacity Planning

Get the answers to how you can modernize and improve your organization’s approach to resource capacity planning.

Download eBook

Resource Fluidity: The ability to quickly and efficiently shift resources to the highest-value work as priorities change.

Resource Optimization: The dynamic, ongoing process of ensuring that an organization’s resources are consistently focused on its highest-value opportunities.

Risk: An uncertain event or condition that, if it occurs, has a positive or negative effect on one or more project objectives.

Risk Management: The processes of identifying, analyzing, responding to, and monitoring risks that arise during a project.

Risk-Adjusted Planning: The integration of risk management directly into the planning process, enabling more realistic forecasts and building resilience into execution.

Rolling-wave Planning: An approach that details near-term activities while maintaining directional flexibility for later project stages.

S

Scenario Modeling: The ability to rapidly create and evaluate multiple planning scenarios based on different assumptions about how the future might unfold.

Scope: The sum of the products, services, and results to be provided as a project.

Scope Creep: The uncontrolled expansion of project scope without adjustments to time, cost, or resources.

Sprint: A fixed time period (usually 1-4 weeks) during which a specific set of work must be completed and made ready for review in Agile methodologies.

Stage Gate: A point in a project where specific criteria must be met before proceeding to the next phase.

Stakeholder: Individuals and organizations who are actively involved in the project, or whose interests may be positively or negatively affected by project execution or completion.

Stakeholder Engagement: The process of identifying, analyzing, planning, and implementing actions designed to involve stakeholders in project decisions and execution.

Strategic Alignment: The explicit connection of project outcomes to enterprise strategic objectives, with quantifiable links between the two.

Strategic Guardrail: Established boundaries or constraints that guide decision-making while allowing flexibility in execution.

Strategic Portfolio Management (SPM): An organizational approach that aligns the selection, prioritization, and execution of projects and programs with the organization’s strategic objectives. It supports project planning by ensuring that the right initiatives are undertaken in the first place, thereby providing clear strategic context for individual project plans. Strategic portfolio management establishes decision-making frameworks for resource allocation, helps resolve conflicts between competing priorities, and provides governance mechanisms to adapt the portfolio when strategy shifts. By evaluating projects against strategic criteria and continuously monitoring their alignment with business goals, it ensures project plans contribute to the organization’s long-term success rather than simply meeting technical specifications.

Strategic Portfolio Management Software: Specialized technology solutions designed to support the strategic management of project, program, and portfolio investments. These platforms provide tools for portfolio visualization, prioritization, scenario modeling, resource allocation, and progress tracking against strategic objectives. Strategic portfolio management software enables organizations to evaluate project proposals based on strategic alignment and value metrics, model different investment scenarios, monitor portfolio health through real-time dashboards, and make data-driven decisions about project investments. Advanced solutions incorporate features like AI-powered forecasting, integrated financial management, capacity planning, and benefits realization tracking to support more effective strategic decision-making across the enterprise project portfolio.

Portfolio Management Graph Image

ON DEMAND-DEMO

Planview Strategic Portfolio Management Software

See how Planview enables company executives, finance, and EPMOs to work together to bring strategy to life and use dynamic planning to quickly shift strategies, priorities, funding, and resources to the most strategic initiatives.

Se demo

Strategy Execution: The process of translating strategic objectives into operational reality through portfolio, program, and project management.

Strategy Realization: The measurement of how effectively project outcomes contribute to achieving strategic objectives.

T

Time-boxing: A time management technique that allocates a fixed time period to each planned activity.

Top-down Planning: A planning approach that starts with high-level objectives and progressively breaks them into smaller components, providing strategic alignment but potentially missing operational details.

U

User Story: A simple description of a product requirement from an end-user perspective, commonly used in Agile methodologies.

V

Value Breakdown Structure: A modern planning component that focuses on outcome definition rather than just scope definition.

Value Measurement: The practice of establishing clear goals focused on business outcomes rather than project outputs, with metrics that track actual value delivered.

Value Metrics: Measurable indicators that directly connect project outcomes to strategic priorities.

Value Realization: The process of achieving the intended business benefits of a project, measured continuously throughout the project lifecycle.

Value Stream: The series of steps an organization uses to provide value to its customers, from initial concept to delivery.

Value Stream Management (VSM): An organizational approach that focuses on optimizing the end-to-end flow of value delivery from concept to customer. In project planning, value stream management connects strategic objectives to execution by mapping, measuring, and improving the processes that deliver value. It involves identifying value streams (sequences of activities that create customer value), eliminating bottlenecks and waste, and establishing metrics that measure value flow rather than just activity completion. Value stream management enables organizations to visualize dependencies across the delivery pipeline, identify constraints limiting throughput, and make data-driven decisions to improve flow. When integrated with project planning, it shifts focus from task-based planning to outcome-based planning, ensuring that project activities are directly connected to value creation and customer satisfaction rather than merely completing predefined deliverables.

Value Stream Management Software: Specialized platforms that enable organizations to visualize, measure, and optimize the flow of value from concept to customer. These tools map entire value streams across organizational silos, tracking work as it moves through different stages and teams. Value stream management software provides real-time visibility into bottlenecks, delays, and inefficiencies in delivery processes, with metrics focused on flow efficiency, lead time, cycle time, and value realization. Advanced solutions integrate with development tools, project management systems, and operational platforms to create a digital thread connecting strategy to delivery. For project planning, these tools help shift focus from managing isolated projects to optimizing the entire value delivery system, allowing teams to make data-driven decisions about where to invest resources for maximum impact.

Viz Graph Image

ON DEMAND-DEMO

Planview Value Stream Management Software

See how Planview uses generative AI, Flow Metrics and automated workflows to drive smarter investment decisions that align technology with business goals.

Se demo

Value Stream Mapping: A lean technique used to analyze the current state and design a future state for the series of events that take a product or service from inception to delivery.

Value-Driven Planning: A planning approach that directly connects to business value creation in environments where change is constant, optimizing for adaptability rather than predictability.

Velocity: A measure of a team’s rate of work, typically used in Agile methodologies to predict future performance based on past performance.

Virtual Team: A group of individuals who work across time, space, and organizational boundaries with links strengthened by information technologies.

Visual Planning: The use of visual tools and techniques to create, communicate, and manage project plans.

W

Waterfall Methodology: A linear and sequential approach to project management where each phase must be completed before the next begins.

Weighted Scoring Model: A technique used to compare and rank projects or options using predefined criteria and assigned weights.

What-if Analysis: A simulation technique used to evaluate scenarios and predict potential project outcomes based on different assumptions.

Work Breakdown Structure (WBS): A hierarchical decomposition of the total scope of work to be carried out by the project team to accomplish the project objectives and create the required deliverables.

Work In Progress (WIP) Limits: Constraints applied to the amount of work items in progress at any given time to improve flow and prevent bottlenecks.

Work Package: A deliverable or project work component at the lowest level of the work breakdown structure.

Y

Yield Management: The process of maximizing project resources by optimizing their allocation and utilization throughout the project lifecycle.

Z

Zero-based Planning: A planning approach that starts each planning cycle fresh without assumptions from previous plans, requiring every element to be justified.